Steering and maturing asset management
Urban public transport network
Structuring and deploying a lasting asset management within a public transport network, from strategic framing to the implementation of a reference framework, governance and a shared roadmap.
Context & challenges
An urban public transport network wants to professionalise the management of its assets (rolling stock, rail and road infrastructure, information systems) and durably embed this discipline in the organisation, beyond one-off projects.
Our intervention
Support in two stages. In the pre-study: strategic alignment, definition of expected outcomes and indicators, a governance and funding model, risk mapping, identification of quick wins and a first change-management plan. In the design phase: a reference framework and roadmap co-built in workshops with the relevant directorates (rolling stock, rail, information systems, business intelligence), activation of the governance body (steering committees and monitoring tools), a change-management plan and an Asset Management Manual.
Results
An asset management that is tooled, governed and steerable, carried by the internal teams and set on a path of continuous maturity growth.
